Mountain View / Kitchen remodeling
Kitchen Remodeling in Mountain View
In Mountain View, new cabinets need a permit. Removing a wall takes months.
Mountain View requires a permit as soon as kitchen cabinets are replaced, and since January 2026 a new gas range brings prewiring for a future electric one. We remodel kitchens here with the load calculation, the reach code and the permit path worked out first.

TWO KITCHEN PERMITS
Like-for-like or a renovation.
Mountain View publishes separate timelines and fee examples for the two kinds of kitchen work. Knowing which one you are in sets the schedule.
| Like-for-like replacement | Renovation, walls removed | |
|---|---|---|
| Typical time to permit | 5 business days | 2 to 3 months |
| City review per cycle | 3 business days | 3 weeks |
| Permit fee example | About $1,000 | About $4,000 for 250 sq ft |
| Plan required | 11 x 17 floor plan and load calculation | Same, plus structural details |
| Planning review | Not needed | Needed if the exterior changes |
Source: City of Mountain View, kitchen remodel permit page ↗
WHAT WE PLAN IN A MOUNTAIN VIEW KITCHEN
Same footprint, or walls coming out?
A like-for-like kitchen typically gets its permit in 5 business days, with 3 business days for each city review. A renovation that removes walls is quoted at 2 to 3 months, with 3 weeks per review cycle. Every kitchen submittal needs an 11 by 17 inch plan and an electrical load calculation.
Cabinets and counters
Replacing cabinets needs a permit; new countertops or refacing existing cabinets do not. That line decides whether a light refresh needs city review.
Gas or induction
A new gas range in a remodel now triggers electric-ready prewiring under Mountain View's 2026 reach code. Choosing induction instead can earn an SVCE rebate.
Circuits
Two 20 amp small-appliance circuits, dedicated circuits for the dishwasher, disposal and microwave, and a 40 or 50 amp circuit for an electric range.
Load calculation
Required with every kitchen permit. If a new service panel is needed, Mountain View requires at least 200 amps for a single-family home.
Range hood
Replacing a hood with an outside vent needs a mechanical permit. The vent ends 3 feet from other openings, and flexible corrugated duct is not allowed.
Open layouts
Removing walls puts the job on the 2 to 3 month track and may require Planning review if the exterior changes. Structure is decided before cabinets are ordered.
SILICON VALLEY CLEAN ENERGY
Rebates for an electric kitchen.
SVCE rebates apply when a gas appliance is replaced with an electric one in an existing home. Reserve before installation; reservations hold for 120 days.
SVCE
Induction range or cooktop
$500, or $750 income-qualified
Replacing a gas range or cooktop.
SVCE
Induction cookware
up to $250
Add-on with a core appliance rebate.
SVCE
New circuits
$500 per circuit, up to $2,000
Prewiring, wiring or a circuit splitter.
SVCE
Panel upgrade add-on
$1,000
With at least one core appliance rebate.
Amounts from svcleanenergy.org/home-rebates, October 2026. Rebates cannot exceed project cost.
Planning the work
How a Mountain View kitchen gets built.
Site visit
Free visit. Walls, panel capacity, gas line, hood route and what the kitchen should do.
Design and load calculation
Layout, appliance list and the electrical load calculation the city requires, with the reach code checked.
Permit
Online submittal with an 11 by 17 inch plan. Like-for-like reviews take 3 business days, renovations 3 weeks per cycle.
Build and final
Rough-in inspections, cabinets, counters and appliances, then the final inspection and rebate paperwork.
MOUNTAIN VIEW AT A GLANCE
Who you deal with in Mountain View.
The permit comes from City Hall, the gas and wires from PG&E, the electricity from Silicon Valley Clean Energy, and a new rule from the city's 2026 reach code. All four touch a kitchen.
- 83,732
- residents, 2024 Census estimate
- 1975
- median year a home was built
- Jan 2026
- electric-ready reach code took effect
Permits
Building Division and ePermitsMV
Kitchen permits are submitted online through ePermitsMV. Fees are confirmed during prescreening and paid online. Virtual appointments with building staff can be booked before submitting.
(650) 903-6313Kitchen remodel permit ↗Reach code
Electric-ready when gas goes in
Ordinance No. 9.2025 requires prewiring for electric equipment when gas or propane equipment is installed in a remodel, only in the area being altered. It applies to permits submitted on or after January 1, 2026.
Green building and reach codes ↗Utilities
PG&E wires, Silicon Valley Clean Energy power
PG&E owns the lines, meters and gas service; Silicon Valley Clean Energy supplies the electricity. SVCE home rebates apply in Mountain View, and the city adds its own heat pump water heater money on top while funds last.
(877) 743-7782SVCE home rebates ↗Larger projects
Express Permits
Single-family remodels of 600 square feet or less qualify for ExpressPermitsMV: city comments by the end of week 2 and a meeting with the plan checker in week 3.
ExpressPermitsMV ↗BEFORE THE PLAN IS DRAWN
What Mountain View checks in a kitchen.
From the city's kitchen permit page, plus the electric-ready rule in Ordinance No. 9.2025 for permits submitted on or after January 1, 2026.
Electrical the city lists
- Two 20 amp small-appliance circuits, no other equipment on them
- Countertop outlets no more than 20 inches above the counter
- GFCI within 6 feet of the sink and AFCI on 15 to 20 amp circuits
- 40 or 50 amp circuit for an electric range or oven
Plumbing and venting
- Dishwasher air gap above the sink rim
- Kitchen faucet 1.8 gpm or less
- Hood vent 3 feet from openings, no flexible duct
Expect a longer path when
- Walls are removed or relocated
- The exterior changes and needs Planning
- The load calculation shows the panel is too small
- Gas equipment is added, bringing reach code prewiring
WHAT TRIPS UP MOUNTAIN VIEW KITCHENS
Problems Mountain View homeowners run into, and how we plan around them.
From residents' posts, local news and the city's own permit and reach code pages.
A permit sits for weeks past the time the city's website quotes.
Packages go in complete with the load calculation, and we follow up with the Building Division directly when a review stalls.
Homeowners hear that cabinet swaps do not need a permit, then find out they do.
Scope is checked against the city's exemption list at the first visit, so the permit is part of the plan, not a surprise.
New kitchen circuits push an older panel over its limit.
The load calculation comes before design; load management or a panel upgrade is priced as an option, not discovered mid-job.
A service upgrade means PG&E has to trench through the city sidewalk.
Service routes are discussed with PG&E early, and the city excavation permit is filed alongside the building permit.
The 2026 reach code catches a gas range swap late.
Appliance choices are confirmed in design, and electric-ready circuits are drawn into the plan when gas stays.
Sources: r/mountainview threads, 2025 to 2026; Mountain View Voice; developmentpermits.mountainview.gov kitchen and reach code pages.
Do I need a permit to replace kitchen cabinets in Mountain View?
Yes. Mountain View requires a building permit for any kitchen remodel that replaces cabinets. Replacing countertops or refacing existing cabinets does not need one. The submittal is an 11 by 17 inch existing and proposed floor plan plus an electrical load calculation.
How long does a kitchen remodel permit take in Mountain View?
5 business days for a like-for-like replacement and 2 to 3 months for a renovation that removes walls, according to the city. Each review cycle takes 3 business days for like-for-like work and 3 weeks for a renovation.
Can I install a gas range in a Mountain View kitchen remodel?
Yes, but with prewiring. Since January 1, 2026, Mountain View's reach code requires electric-ready wiring when gas or propane equipment is installed during a remodel, so a future induction range can be connected without opening walls.
Does a Mountain View kitchen remodel require a 200 amp panel?
Only if the panel has to be replaced. The load calculation decides whether the existing service carries the new kitchen. When a new service panel is needed, City Code Section 8.51(C) requires at least 200 amps for a single-family home.
What are the city permit fees for a kitchen remodel in Mountain View?
About $1,000 for a like-for-like replacement and about $4,000 for a 250 square foot renovation, including inspections, according to the city's examples. The exact fee is set during prescreening.
Is there a rebate for switching to induction in Mountain View?
Yes. SVCE pays $500 for replacing a gas range or cooktop with induction ($750 income-qualified), up to $250 toward induction cookware, and $500 per new circuit. The rebate must be reserved before installation.