Panel Upgrades
200A & 400A Service Upgrades for Bay Area Homes
From a 100A swap to a Federal Pacific replacement — permits, PG&E coordination, and inspection sign-off all under one C-10 license. Fixed written quote before we lift a tool.
What & Why
From a 100A panel to a 200A service in one day.
A panel upgrade is more than swapping a box on the wall. We re-size the conductors, refresh the grounding, replace the meter base if the utility flags it, and bring the bonding to current code — all while the inspector is in the loop and the permit is on the door.
Whether you are replacing a Federal Pacific, getting ready for an EV charger, or planning solar, the answer almost always starts here.
Typical Project Snapshot
Common ranges for a Bay Area residential panel upgrade. Exact numbers are confirmed in your written quote.
Service Size
100A → 200A or 400A
Time On-Site
1–2 days typical
Outage Window
6–10 hours typical
Permit + PG&E Lead
2–8 weeks typical
Documentation
Permit card, load calc, signed inspection, manufacturer warranties on parts
What's Included
Six things, every job.
Same workflow whether you are upgrading a 1970s Eichler or a 2-story new build.
Site & Load Assessment
Full electrical load calculation per NEC. Existing panel condition, grounding, and bonding inspected. PG&E service drop reviewed for capacity.
Permit & Materials
Permit pulled under our C-10 license. Panel, breakers, mast, meter base, conductors, and grounding kit ordered and on-site before cut-over day.
PG&E Coordination
Temporary disconnect scheduled with PG&E. Inspection appointment booked with your city or county building department.
Same-Day Install
Service cut, old panel removed, new panel set, breakers labeled, grounding verified, GFCI/AFCI per current code. Typical outage window 6–10 hours.
Inspection Sign-Off
Inspector visit coordinated. Any callouts addressed same-day. Signed permit card delivered before final invoicing.
Documentation Handoff
Permit card, load calc, manufacturer warranties on panel and breakers, and final inspection sign-off — packaged in a folder you can give your insurance carrier.
When to Upgrade
Six signs the panel is the bottleneck.
Federal Pacific or Zinsco
Documented fire risk and an insurance flag. Plan replacement.
Fuse Box Still in Use
Anything older than the late 1960s. Capacity and safety standards have moved on.
Frequent Breaker Trips
Your panel is at capacity. Adding circuits without an upgrade just moves the problem.
Planning an EV Charger
Level 2 charging on top of HVAC and appliances often pushes 100A and 125A panels over the limit.
Solar or Battery Plans
Most modern PV and storage interconnects require a 200A or 225A main breaker.
Kitchen or ADU Remodel
Induction range, heat-pump water heater, ADU sub-meter — load math usually points at 200A minimum.
Pricing Context
What a panel upgrade typically costs in the Bay Area.
Every job gets a written fixed-fee quote.
Permit fees, PG&E reconnect charges, and any utility-side upgrade are passed through at cost and itemized on the quote.
FAQ
Panel-upgrade questions, straight answers.
Service size is determined from the actual existing and proposed equipment, accepted assessment method, supply condition and project requirements. A count of EVs or a solar installation alone does not determine whether 200A or 400A is required.
Ready When You Are
Get a fixed quote for your panel upgrade.
Quote within 3 business days.
Questions worth a closer look
From a short answer to a practical plan.
Explore the causes, tradeoffs and records behind these common project questions.
What should two 200A upgrade quotes include for a fair comparison?
Compare the same meter location, equipment, service route, utility and permit responsibilities, restoration work, and outage assumptions. Ask each estimator to separate confirmed base scope from unresolved utility requirements and optional work.
Read the full guide: Why two 200A electrical service upgrade quotes can describe different projects ↗Does a larger subpanel increase the available supply?
A larger enclosure may add circuit positions, but it does not create supply capacity. The feeder, its protection, upstream equipment, and evaluated loads determine the appropriate installation.
Read the full guide: A larger subpanel can add spaces without adding available power ↗Contact Us
Request A Consultation
Local Services
We're in your city.
Choose your city and tell us what you need. We'll plan the project around your location.
Choose your city to include it with your project details.
Or call us to discuss your project:
(650) 550-0819Request received
Thank you. Your request has been received.