Owner + design team
Confirm the parcel
Verify city or county jurisdiction, property records, existing permits and the proposed scope.
Exit condition: A confirmed address, parcel and scope brief.
08 / Plan the handoffs before the start date
Map the path from a complete application to an issued permit and utility clearance. Build a schedule from current agency estimates instead of a generic promise.

Project type, completeness, revisions, other departments and utility work affect the path. Use the responsible agency’s current estimate for your exact application.
Owner + design team
Verify city or county jurisdiction, property records, existing permits and the proposed scope.
Exit condition: A confirmed address, parcel and scope brief.
Planning department
Ask about zoning, use, design review and any site constraints before completing a building package.
Exit condition: A planning clearance or a defined planning review path.
Designer + contractor
Coordinate drawings, calculations, product documents and required energy forms. Use the current agency checklist.
Exit condition: A package accepted as complete for review.
Design team + reviewers
Keep one response log linking every comment to a revised sheet or written explanation.
Exit condition: Review comments resolved across all required departments.
Permit applicant
Confirm fees, signatures, contractor information and other conditions for issuance.
Exit condition: An issued permit and the approved construction documents.
Contractor + utility + inspector
Resolve utility design or service work, schedule required inspections and preserve access to work before it is covered.
Exit condition: Required inspections and utility releases completed.
Enter durations in calendar days. Convert agency business-day estimates before entering them and allow for holidays. This models readiness after permit issuance and any utility clearance needed before construction; it does not estimate the construction or final inspection period.
A review target is not a guarantee of issuance. Keep a dated log of the agency estimate, dependencies and the next responsible person.
Find the responsible agency →A service change can require utility coordination separate from the building permit. Identify design, access, customer work and any disconnect/reconnect or inspection-release steps early.
PG&E’s building and renovation resources describe project pathways. For municipal utility service, use the local utility’s requirements.
PG&E project resources ↗Equipment procurement, contractor scheduling, construction inspections and final permit closeout follow their own sequence. Add these to the project schedule instead of treating the permit date as the completion date.