Commercial · Tenant improvements
Tenant Improvement Electrical Wiring, From existing space to working suite.
Turn the approved tenant layout into a coordinated electrical scope. Plan demolition, new circuits, lighting and equipment connections around the building you are moving into.
Project planning
Bring the lease work letter, current plans and the equipment list. These five decisions shape the electrical package.
The starting point
Start with what the building actually provides.
A commercial electrical build-out starts before new wiring is installed. The existing service, tenant feeder, panel schedules and demolition limits determine what can remain and what needs to change. An empty breaker space alone does not establish available capacity.
For a tenant improvement, compare the proposed layout with the landlord's work letter and the other trades' drawings. That makes base-building work, tenant work and unresolved design decisions visible before a construction schedule depends on them.
Project concepts
Explore the installation possibilities
Drag the divider to compare before and after, or open a comparison for a closer look.

Drag to compare

Drag to compare
Scope of work
The electrical decisions behind a tenant fit-out.
Survey before demolition
Identify circuits to retain, equipment to relocate and wiring that can be removed. Confirm which adjacent spaces share the affected systems.
Panel and circuit planning
Review the equipment schedule and load information, then define branch circuits, distribution changes and any required feeder or service review.
Lighting and controls
Coordinate fixture locations, switching and control zones with the ceiling plan. Identify applicable energy-code documents and testing responsibilities.
Mechanical connections
Match power connections and disconnect locations to the approved HVAC, water-heating and other equipment submittals before rough-in.
Occupied-building sequence
Agree access, outage windows and temporary operating needs with the tenant and property manager. Keep these constraints visible in the construction schedule.
Inspection and turnover
Plan rough and final inspections around the work. Define the marked-up drawings, circuit directories and operating information needed at handoff.
Project handoff
A handoff the next contractor can use.
Confirm these records in the project scope so completed work remains understandable after the move.
Circuit directory
Identify the spaces and equipment served by the new or modified circuits.
Marked-up plans
Record agreed routing and installation changes made during construction.
Control records
Keep programming information and applicable installation or acceptance documents with the project files.
Equipment information
Collect product details and maintenance instructions for the equipment included in the electrical contract.
Project scenarios
Different starting spaces need different scopes.
A square-foot allowance cannot describe every tenant improvement. Start with the condition and intended use of the space.
Occupied suite
Phased alterations
Keep the operation in view
New partitions, moved workstations or a reworked reception area may affect existing circuits. Map the occupied zones and plan each outage before changes begin.
Vacant suite
New tenant layout
Verify what can be reused
Review existing panels, fixtures and above-ceiling wiring against the new layout. Reuse should follow a condition and capacity review, not an assumption from the previous tenant.
Shell or change of use
Distribution and systems
Resolve the upstream scope
A new use can change equipment loads, lighting and distribution. Clarify design responsibility and base-building capacity before pricing only the visible outlets and fixtures.
The proposal should identify permit scope, landlord work, testing, access restrictions and unresolved design items separately.
Project concepts
Installation details
Drag the divider to compare before and after, or open a comparison for a closer look.

Drag to compare

Drag to compare
FAQ
Planning a commercial electrical remodel.
Related construction service
Planning the full tenant improvement?
The construction scope may also include walls, ceilings, finishes and coordination between trades. Review the broader tenant improvement service alongside the electrical package.
Plan your project
Bring the plans and the building constraints.
Tell us the property location, current use, proposed layout and project stage. Include the landlord's electrical requirements if they are available.
Questions worth a closer look
From a short answer to a practical plan.
Explore the causes, tradeoffs and records behind these common project questions.
What should an electrical review establish before we sign a commercial lease?
It should compare the proposed equipment schedule with the actual voltage, phase, tenant feeder and upstream capacity, then identify required upgrades, landlord approvals and outage constraints. Empty breaker spaces alone do not establish available capacity.
Read the full guide: Check a commercial space’s electrical capacity before signing the lease ↗Contact Us
Request A Consultation
Local Services
We're in your city.
Choose your city and tell us what you need. We'll plan the project around your location.
Choose your city to include it with your project details.
Or call us to discuss your project:
(650) 550-0819Request received
Thank you. Your request has been received.