Utility Coordination

Electrical Service Work with a Clear Utility Plan

Changing a service, relocating a meter or adding a major load can involve both property work and utility work. YKCA helps organize the electrical scope, project information and handoffs so those responsibilities are clear.

What & Why

The electrician and utility have different parts of the job.

A new panel does not by itself establish that the utility can supply the proposed load. Begin with the existing service arrangement, the planned equipment and the serving utility. Describe any relocation, trenching or temporary power needs early.

For PG&E projects, Building and Renovation Services provides an application and project-management process. The project team should track the application number, open design questions and required releases alongside the local permit. A submitted application is not a construction appointment.

Useful information for the first conversation

Project type

New service, added load, meter move or replacement

Existing utility record

Application number and assigned contact, if any

Property information

Site plan, access and proposed equipment location

Schedule constraints

Occupancy, business hours and acceptable outage periods

Project Scope

Define the work and the handoff.

The written scope should identify equipment, responsibilities and the conditions that affect completion.

Define the requested change

Translate the equipment plan into an electrical scope and identify what is being requested from the utility.

Prepare project information

Gather load information, service details and drawings needed for the application. Identify missing decisions before submission.

Track design questions

Keep utility comments and requested revisions with the project documents. Name the person responsible for each response.

Separate property and utility work

Identify who handles trenching, structures, service equipment and utility-owned facilities, including restoration of disturbed areas.

Coordinate the outage

Plan around utility scheduling, inspection releases and site readiness. Communicate the confirmed outage arrangement to affected occupants.

Close out the records

Collect inspection records and utility completion information. Distinguish work completed on the property from steps still awaiting the utility.

Before You Choose

Four milestones to track separately.

Use these distinctions to review the proposal and identify what still needs a decision.

Planning itemWhat to establish
Application submittedReceipt and project number, with an owner for follow-up.
Design resolvedRequired work, responsibility and outstanding conditions are documented.
Site readyElectrical work and required inspection or clearance are ready for the agreed sequence.
Utility work completedThe actual connection or service change is confirmed in the project record.

Estimate Planning

What shapes the project estimate?

Compare the same scope, identify exclusions and keep unresolved work visible before authorizing construction.

  • Application support and preparation of electrical documents
  • Service relocation, trenching and site access
  • Utility requirements identified during project review
  • Outage coordination and restoration of disturbed areas

FAQ

Utility Coordination: questions before work begins.

Does YKCA set the utility completion date?

The utility controls its review and scheduling. The contractor can prepare information, respond to comments and make the site ready. Keep proposed dates separate from utility-confirmed appointments.

Do I apply before buying the new service equipment?

Generally, yes. Establish the utility’s project requirements and coordinate equipment selection before final purchase. Verify the exact model, metering arrangement, location and approved alternatives with the project team. A readily available panel is not automatically suitable for the proposed service.

Is a building permit the same as utility approval?

No. Track local permitting and the utility project separately. Determine which inspection releases or documents the utility needs before connection.

Can you help with a project that is already open?

Begin by reviewing the existing application, accepted documents, open comments, installed work, and authorized contacts. A recovery plan should preserve valid prior approvals while identifying corrections and unfinished responsibilities. Changing contractors does not by itself establish a new utility completion date.

Will the power be off for only one day?

A one-day labor estimate does not guarantee same-day power restoration. Confirm contractor readiness, inspection release, PG&E authorization and reconnection scheduling before disconnection. Assign the handoffs and plan for essential needs if a dependency fails.

Technical references · reviewed October 3, 2026

Your Next Step

Discuss your utility coordination project.

Share the property, existing equipment and the result you need. We can define the next practical step.

Frequently asked project questions

Work through the difficult decisions.

Explore the causes, choices and practical next steps behind common project questions.

How can we get a useful update on a delayed utility upgrade?

Ask for the current stage, exact unfinished dependency, responsible party, and evidence needed to move forward. Maintain a dated issue ledger and use the utility’s current escalation process when appropriate. Historical wait times and an application number do not establish a completion date.

Read the full guide: The utility upgrade is delayed: ask for the missing dependency, not another estimate ↗
Why can an underground electrical service upgrade have a much larger scope than panel replacement?

Increasing service may require changes to underground routes, conductors, utility facilities, access, and finished-surface restoration. The actual scope depends on the utility-approved design and existing conditions. Compare estimates using the same route, ownership boundaries, civil work, and stated unknowns.

Read the full guide: Why an underground service upgrade can cost more than the new panel ↗

Browse all service guides ↗

Contact Us

Request A Consultation

Local Services

We're in your city.

Choose your city and tell us what you need. We'll plan the project around your location.

Choose your city to include it with your project details.

Or call us to discuss your project:

(650) 550-0819

Send your project details to YKCA.

Project: Utility Coordination

Request received

Thank you. Your request has been received.

×

Contact Us

For More Info!