Commercial · Restaurant electrical
Restaurant Electrical, Build the scope from the equipment schedule.
Coordinate kitchen equipment circuits, refrigeration, lighting and point-of-sale connections around the restaurant layout. Resolve power requirements before appliances arrive.
Project planning
Bring the kitchen plan and current equipment submittals. Model changes can alter the electrical work.
The starting point
The menu and equipment choices shape the power plan.
A restaurant electrical installation depends on the actual appliances, not a generic list of kitchen outlets. Cooking equipment, dishwashing, water heating and refrigeration can have different supply and connection requirements. Final equipment selections should be reviewed before circuits and connection points are set.
For an existing restaurant, determine which loads stay, which equipment moves and what must remain operating. Restaurant electrical load calculations belong with that equipment review and the assessment of the building's existing distribution.
Scope of work
Coordinate the kitchen and the front of house.
Review equipment submittals
Collect model numbers and electrical requirements for cooking, dishwashing, refrigeration and service equipment. Record substitutions before they affect rough-in.
Check power distribution
Review voltage, phase, documented load and proposed equipment with the existing panels and service. Identify upstream changes before procurement depends on them.
Locate connection points
Coordinate receptacles, disconnects and fixed connections with equipment placement, clearances and manufacturer instructions.
Define hood interfaces
Coordinate the electrical interface with the hood, ventilation and fire-suppression contractors. Assign design, connection and testing responsibilities explicitly.
Plan customer-facing systems
Coordinate dining and task lighting, POS terminals, data pathways and approved security or audio connections with the operating layout.
Sequence and verify
Plan shutdowns around food storage and operations. Coordinate electrical inspections and equipment checks with the other project approvals.
Project concepts
Explore the installation possibilities
Drag the divider to compare before and after, or open a comparison for a closer look.

Drag to compare
Project handoff
Keep the equipment and circuit records together.
The operator needs to know what serves each appliance and which team maintains each system.
Equipment schedule
Connect the selected appliance models to the agreed electrical scope.
Circuit directory
Identify circuits and connection points serving the kitchen and support equipment.
Interface records
Document agreed hood, controls and specialist-system handoff points.
Project documentation
Keep electrical inspection records and installed-product information with the project files.
Project scenarios
Three restaurant starting points.
The condition of the space and the equipment changes matter more than an assumed construction duration.
Equipment replacement
One appliance can change the circuit
Review the new model
A new oven, dishwasher or coffee machine may require a different supply or connection. Compare the new submittal with the existing circuit before delivery.
Existing restaurant
Remodel around operations
Protect the operating sequence
Identify retained refrigeration and other critical equipment. Phase the work and agree outage arrangements with the operator before construction starts.
New restaurant
Build out the full distribution
Coordinate the whole kitchen
Develop the electrical scope with the kitchen, ventilation and life-safety designs. Confirm the service and distribution requirements before treating the space as ready for equipment.
Electrical work does not by itself establish health, fire or overall occupancy approval. Coordinate the responsible trades and agencies for the actual project.
FAQ
Restaurant electrical questions before rough-in.
Related construction service
Planning the restaurant construction as well?
Review the restaurant build-out service for the broader construction scope, including the layout, finishes and coordination between the kitchen and dining areas.
Plan your project
Share the kitchen plan before equipment is ordered.
Tell us whether this is a new restaurant, a remodel or an equipment change. Include the appliance schedule and the systems that need to stay operational.
Questions worth a closer look
From a short answer to a practical plan.
Explore the causes, tradeoffs and records behind these common project questions.
Can a used appliance’s plug tell us the electrical connection it needs?
No. Use the actual nameplate and model-specific installation documents, and have uncertain modifications reviewed by qualified service personnel. Confirm voltage, phase and connection requirements before moving or buying the appliance.
Read the full guide: Before buying restaurant equipment, match its voltage and phase to the building ↗Contact Us
Request A Consultation
Local Services
We're in your city.
Choose your city and tell us what you need. We'll plan the project around your location.
Choose your city to include it with your project details.
Or call us to discuss your project:
(650) 550-0819Request received
Thank you. Your request has been received.