From Drying to Rebuilding: Handoff Checklist
Coordinate the information the repair contractor needs and identify decisions still open. This checklist does not replace permits, inspections, a construction contract, or professional approval of concealed work.
Clear all checkmarks and notes on this page?
Entries stay on this page until you leave or reload. Print to keep a copy.
Have the drying report, source-repair information, and proposed reconstruction scope available. If the source remains unresolved, new damage is appearing, or an affected layer was not assessed, ask the responsible professionals to address that gap before it is concealed.
Project notes
Sources and further reading
References checked 2026-09-27. Guidance depends on the loss, affected materials, scope of work and property conditions.