EV Charging
Bay Area EV Charger Installation — Residential, Commercial, Fleet
Tesla Wall Connector, ChargePoint, JuiceBox, Wallbox — hardwired Level 2 chargers in homes, commercial fleet stations, condo and apartment shared infrastructure, and CALGreen Title 24 EV-ready pre-wire on new construction.
What We Do
Brand-agnostic, code-compliant, load-calc honest.
EV charging installs are not just "plug it in." Most Level 2 chargers draw 40–60 amps — a real share of a typical 100A service. We start every install with a load calculation, confirm the panel can support the charger, and quote the panel upgrade up front if it can't. No mid-job surprise charges, no sales push for an upgrade you don't need.
For commercial fleet, condo, and multi-unit work we handle the panel layout, load management equipment, ADA-compliant parking integration, and utility rebate qualification — Silicon Valley Power and PG&E both run EV programs that change frequently, so we verify current eligibility against your project before submitting.
Tesla Wall Connector — real YKCA install.
EV Charging Services
Eight scopes, one C-10 crew.
From a single Tesla Wall Connector at a Peninsula home to a 24-port commercial fleet station, same technicians.
Residential Level 2 Charger
40–60A hardwired chargers in single-family homes — Tesla Wall Connector, ChargePoint, JuiceBox, Wallbox. Dedicated circuit, GFCI per code, weather-rated install if outdoor.
Learn morePanel Upgrade for EV
When the existing service can't support a charger, we size and install the 200A panel upgrade as part of the same package. PG&E or muni-utility coordination handled.
Learn moreTesla Wall Connector
Tesla-certified install practice. Hardwired termination, dedicated 60A or 100A circuit, universal connector supported for non-Tesla EVs.
Learn moreNEMA 14-50 & Brand-Agnostic
ChargePoint, JuiceBox, Wallbox or a NEMA 14-50 outlet for any EV's mobile connector. Hardwired or plug-in, app-controlled load management.
Learn moreCommercial Fleet & Workplace
4–24 port Level 2 stations, fleet charging, load management for shared panels, SVP/PG&E rebate program qualification, ADA-compliant parking layouts.
Learn moreCondo & Multi-Unit Charging
Shared-infrastructure EV charging for HOAs, condos, and apartment buildings — sub-metering, billing strategies, common-area panel coordination.
Learn moreRebates & Incentives
PG&E and Silicon Valley Power programs, air-district grants. We identify what applies and handle the paperwork.
Learn moreCost Calculator
Get an instant ballpark for your install by charger type, distance from the panel, and panel capacity — then book a free written quote.
Learn moreFor Builders & Developers
CALGreen Title 24 EV-ready pre-wire.
California Title 24 Part 11 (CALGreen) requires new construction — residential and commercial — to install EV-ready conduit and panel capacity even when no charger is included in the initial build. EV-ready and EV-capable scopes are part of our standard new-construction and major-remodel workflow. We coordinate with the GC, deliver inspection-ready documentation, and size the pre-wire so the eventual charger install is a plug-and-play addition.
Contractor PortalEV-Ready Standards
- Dedicated 208/240V conduit and box
- 40A circuit panel capacity reserved
- Multi-unit shared-infrastructure layouts
- Commercial fleet load management
- Acceptance-test documentation
FAQ
EV charging questions, straight answers.
Ready to Plug In?
Schedule a load-calc + quote visit.
Written quote within 3 business days.
Contact Us
Request A Consultation
Local Services
We're in your city.
Choose your city and tell us what you need. We'll plan the project around your location.
Choose your city to include it with your project details.
Or call us to discuss your project:
(650) 550-0819Request received
Thank you. Your request has been received.