Explore the guideDifferent parties may own the route, equipment, and operating account.
Workplace charging service ↗All service guides ↗
The key decision
Review the lease and California Civil Code section 1952.7 before treating landlord approval as unrestricted discretion. Resolve applicable approval, parking, insurance, ownership, maintenance, electricity, and move-out obligations in writing, then coordinate the approved electrical scope.
A tenant may not control every part of the installation
A workplace program may look like a simple employee benefit until the tenant discovers that parking, electrical rooms, and utility accounts are controlled by different parties. The workplace Reddit discussion raises sharing and access questions; it does not document a commercial lease dispute. The lease-specific analysis here follows DOE's note that leased workplaces require negotiation with building owners, together with California law. Do not assume that everyday use of a parking stall gives a tenant authority to alter it.
Source: Alternative Fuels Data Center: Workplace Charging for Electric Vehicles · California Civil Code section 1952.7: commercial tenant charging · What’s your workplace shared-charging policy?
Separate permission, ownership, and electrical authority
DOE notes that charging at leased workplaces requires negotiations with building owners. The central issue is allocation of control. Permission to install equipment, permission to use a parking space, and authority to modify the electrical service are separate matters. The lease or a written agreement should address them together. Legal terms should be reviewed by the parties' advisors; a contractor's electrical scope cannot determine ownership rights.
Source: Alternative Fuels Data Center: Workplace Charging for Electric Vehicles · Alternative Fuels Data Center: Procurement and Installation for Electric Vehicle Charging Infrastructure
Check California’s commercial tenant charging statute
Civil Code section 1952.7 limits prohibitions and unreasonable restrictions in commercial leases executed, renewed, or extended on or after January 1, 2015. When approval is required, it may not be willfully avoided or delayed, and the decision must be written. The section excludes properties with fewer than 50 spaces and those already providing tenant charging at the specified ratio of at least two charging spaces per 100 parking spaces. It also limits the parking allocation a tenant can claim.
For covered installations, the statute sets written tenant commitments, including reasonable installation standards and a licensed contractor. It specifies $1 million in lessee liability coverage, lessor additional-insured status, related property insurance, and an insurance certificate within 14 days of approval. For covered installations, the statute makes the lessee responsible for damage costs resulting from installation, maintenance, repair, removal or replacement; for maintenance, repair and replacement of the station; and for the station’s electricity. Have the parties' legal and insurance advisers confirm applicability and the required documents; statutory protection does not eliminate electrical permits or authorize work without required approval.
Source: California Civil Code section 1952.7: commercial tenant charging
Illustrative scenario: chargers outlast a three-year lease
Illustrative scenario: a tenant has three years remaining on its lease and wants six charging ports. The landlord will allow conduit in a common trench but wants the pedestals retained after move-out. The tenant pays the network subscription, while electricity is included in a shared building account. Without a written transfer arrangement, the next occupant could inherit physical chargers that nobody can administer, and the outgoing tenant could remain responsible for subscription charges or restoration.
Create an asset ownership schedule
Create an ownership schedule covering service upgrades, conduit, panels, pedestals, chargers, network accounts, and stored operating data. Identify who pays initially, who maintains each component, who can change settings, and what happens at lease termination. Ask whether relocation or removal is permitted and what condition the property must be restored to. Keep the equipment warranty and network contract aligned with the entity that will actually own and operate the system.
Secure maintenance and communications access
Review operational access as well as construction access. Can technicians enter electrical rooms after hours? Who approves outages affecting other tenants? Are charging spaces available during evening events? Can public users enter, and does the proposed funding program require that access? A charger that depends on another tenant's Wi-Fi creates a preventable dependency. Obtain a supported communications arrangement and secure administrator handoff that can survive a tenant change.
Walk through an ordinary service visit and a future move-out
Test the proposed agreement with two concrete events. First, a charger fails on a Friday evening and the technician needs access to a locked electrical room on Saturday. Identify who can authorize entry, who can approve any required interruption, and who receives the service report. If those permissions depend on a person who is unavailable outside business hours, the quoted repair response may not be achievable even when the equipment vendor has a technician ready. Access arrangements are part of the operating plan, not a detail to discover after installation.
Second, imagine the tenant leaves while the landlord keeps the charging equipment. List what must transfer: administrator ownership, subscriptions where transferable, warranty records, drawings, device identifiers, support contacts, and any legitimately retained operating records. Then identify what should be removed, including former employee credentials and unnecessary personal account data. Do not exchange shared passwords as a substitute for the provider's supported transfer process. Ask the network operator what transfer is possible before selecting a contract that may outlast the tenancy.
Bring this scenario review into the construction scope. A proposal should distinguish equipment ownership from permission to use the property and from responsibility for electricity costs. Mark any landlord work, tenant work, utility work, or later restoration obligation separately. If the parking arrangement changes, check whether the charging spaces remain reachable and usable by the intended drivers. Keep approvals in a place the next facilities manager can find, rather than only in an installer's email thread. The goal is a charging service that remains administrable through normal staff and tenancy changes. A physical installation can be perfectly functional while its business arrangements make repairs, billing, or transfer unnecessarily difficult; resolving those arrangements early avoids treating every later change as a construction dispute.
Reconcile the agreement before authorizing construction
Before authorizing construction, reconcile the landlord agreement, electrical drawings, network proposal, parking policy, and utility application. They should name the same equipment owner and operating arrangement. At closeout, retain plans and account-transfer instructions with the lease records. A future lease renewal or move then becomes a manageable business decision instead of an emergency search for passwords, buried conduit routes, and undocumented restoration obligations.
Put it into practice
A decision table to keep handy
| Decision point | Evidence to obtain | What it changes |
|---|---|---|
| Physical infrastructure | Ownership and removal agreement | What remains at lease end |
| Electricity and network | Account holder and payment responsibility | Who can operate and change the program |
| Shared property access | Outage, parking, and maintenance permissions | Whether the installation remains usable |
Bring this to the conversation
Your next-step checklist
Common questions
Can we install chargers at a leased office?
A leased office may be able to add charging, but first review the lease, parking allocation, electrical feasibility, and applicable California Civil Code section 1952.7 protections and exceptions. Resolve required approval and insurance documents along with equipment ownership, maintenance, electricity payment, and lease-end transfer or removal in writing.
Check the original guidance
Sources & review date
Primary guidance and available source excerpts reviewed October 4, 2026. Requirements and program terms can change; verify the current instructions for your property and project before committing to work.
- Alternative Fuels Data Center: Workplace Charging for Electric Vehicles
- Alternative Fuels Data Center: Procurement and Installation for Electric Vehicle Charging Infrastructure
- California Civil Code section 1952.7: commercial tenant charging
Reader discussions behind this guide
These discussions illustrate reader problems; they are not technical instructions or a measure of how common a problem is. The guidance above draws on the primary sources listed here.
Continue with the next decision