For general contractors: prepare a trade bid that can be compared
Use the general-contractor page to organize drawing revisions, scope boundaries and the decisions behind a useful bid.
THE KEY POINT
A trade bid becomes comparable when everyone prices the same revision, interfaces and site conditions.
Start with the correct project stage
The General Contractors page is a preparation guide for a trade discussion. Use its project-stage buttons to review the relevant checklist before contacting YKCA. Early budgeting, an active bid and coordination during construction require different information. Say which decision you need the proposal to support.
For a budget conversation, mark unsettled design items clearly. For a construction bid, identify the current drawing issue, specifications and addenda. Sending every historic file without a revision list makes it harder to know which details control the price. A short document index is often more useful than another unlabelled attachment.
Make the interfaces visible
List who supplies equipment, who installs it and who provides connections, backing, penetrations and finish repairs. Include controls and commissioning responsibilities when systems cross trade boundaries. An electrical line item can be incomplete if the associated trench, equipment pad or restoration is assumed to belong to another contractor.
Ask for exclusions and allowances in a separate list. Compare those lists alongside the totals. When an assumption differs between bidders, resolve it or request an alternate before deciding that one price is better. The aim is a common scope, not identical proposal formatting.
Describe the site and sequence
Occupied rooms, restricted work hours, deliveries and required shutdowns affect the work plan. Provide what is known about site access and identify which conditions need a visit. Do not treat a desired completion date as proof that design, permits, materials and utility work can all be ready in time.
Name the contact authorized to answer scope questions and the person coordinating schedule changes. Put questions that affect price or construction in a shared written record. A response issued only to one bidder can create another difference that is invisible in the comparison.
Close the loop after the proposal arrives
Build a comparison sheet with scope, exclusions, allowances, drawing revision and schedule assumptions. If a line is unclear, ask a specific question and record the answer with the proposal. Resolve whether the requested deliverable is a planning estimate or a defined construction offer.
For the eventual handoff, discuss inspection responsibilities, updated labels, equipment information and unresolved work. The partner page helps organize that conversation; it does not create a subcontract, reserve a crew or accept project insurance requirements. Those commitments need the actual project documents and agreement.
Keep the next steps clear
| Step | What to record | Why it helps |
|---|---|---|
| Documents | Drawing issue and addenda | Price the same design |
| Interfaces | Included and excluded work | Find gaps between trades |
| Sequence | Access and inspections | Test the schedule |
BEFORE THE NEXT STEP
Your checklist
A useful question
What should a general contractor send for a useful trade bid?
Send the current drawings and addenda, scope boundaries, equipment responsibilities, access constraints, target sequence and bid deadline. Identify allowances and unresolved design decisions.
PUT THE GUIDE TO WORK
Page & sources
This guide helps you prepare for a conversation with YKCA. Reviewed October 3, 2026. Check current project terms and official instructions when making a decision.
CONTINUE WITH THE NEXT DECISION
Related Company guides
Ready to use what you have learned?
Open General contractors